This scheme involved vegetation and tree clearance to enable us to clean and widen the existing drainage ditch over 100 meters in length. Replace post and rail boundary fences over 150 meters in length. Then excavate and create a filtration pond so the existing highway drainage could be connected. Install a new gully and connection from the underpass to stop flooding, sections of 900mm concrete pipes and headwalls were also installed for the farmers access and to protect some trees from sliding into the ditch course to prolong their life.