R&C were awarded the works to carry out hydro demolition, concrete repairs, testing, waterproofing and resurfacing of the bridges at Dartmouth Circus, Birmingham.
As the bridges cross the A38(M) Aston Expressway, these were works that had a high media profile locally. The works were carried out in 4 phases to ensure that the strength of the bridge structure was not compromised at any point. With works going on at high and low level at the same time, the works had to be closely coordinated at all times to carry out the works in a safe and efficient manner. With time constraints very tight the works went extremely well, saving time and closures on a number of occasions.